
►Settings Tab
- Exchange Primary Server configuration with Secondary Server Configuration.
- Set Report history by days.
- Set Mass Deletion value is the number which helps to prevent mass deletion from the secondary server content. Operator approval is required if application will delete more than value number of clips. If value is 0, then no approval required.
- Apply - saves configuration changes.

- Press connect button. This will connect and load content from primary server.
- Press connect button. This will connect and load content from secondary server.
Note: In demo mode connect buttons should be pressed sequentially within 5 seconds.

After both servers are connected, content will appear color coded in the display grid.
4. Black signifies that content is mirrored on both primary and secondary server.
5. Green signifies content that will be mirrored from primary to secondary server.
6. Red signifies content that is not on primary server and will be deleted from
secondary server once the synchronization process starts.
7. Start Mirror button will start synchronization process.

Grey signifies content that is currently being mirrored from primary to secondary server.
|